sunset gf36fff8b3 1920

Halliburton Company has completed the installation of the industry's first single trip, electro-hydraulic wet connect in deepwater for Petrobras in Brazil, marking a significant achievement in downhole electric completion technology.

The Halliburton Fuzion EH electro-hydraulic downhole wet-mate connector helps increase well recovery factors by maintaining integrity of Halliburton's SmartWell completion systems throughout the well's lifecycle. It helps further facilitate safer and simpler intervention operations and avoids potential formation damage because of workover operations.

Halliburton plans a future version of a dual trip system Fuzion-EH connector for qualification and implementation by Petrobras in 2023. This system will provide additional benefits in SmartWell system installations while maintaining the benefits of the single trip system.

Mark Dawson, Vice President of Halliburton Completion Technology, Halliburton, commented, “The Fuzion-EH connector is the first step in the fully electric intelligent completion journey and is a product of collaborative development with Petrobras and Shell. This achievement paves the way for us to give customers the autonomous capability to control and manage reservoirs across their wells and assets and deliver on our Future of Completions.”

Olivier Wambersie, General Manager Brazil Technology, Shell, added, “This significant well technology development marks the first single trip, multiple zones, open hole completion. It was a remarkable example of teamwork, partnership and technical collaboration between operators and Halliburton in the Brazilian ecosystem. This technology's first application was enabled using the ANP Levy.”