Island Drilling Company has announced the successful completion of its recent contract with Tullow Oil.
The operations, conducted in Mauritania over a period of three months, were carried out in water depths ranging from 208 meters to 1200 meters using dynamic positioning (DP) alone.
Throughout the project, all health, safety, and environmental (HSE) standards, and key performance indicators (KPIs) were achieved. The plug and abandonment (P&A) operations were completed within the planned timeframe and under budget, reflecting the efficiency and effectiveness of the collaboration.
The feat was achieved through the company's 'one team' approach by excellent cooperation between its offshore and onshore segments.