• Region: Middle East
  • Topics: Well Intervention
  • Date: 26th November 2026

Two Abraj engineers onshore rig desertAbraj Energy SAOG is getting to grips with a major contract to provide nine workover hoists on behalf of Petroleum Development Oman (PDO).

The awarded units include six new rigs and three existing rigs, out of Abraj Energy’s current fleet of five units, with a capacity ranging from 550 horsepower (HP) to 750 HP.

The Oman-based integrated energy services group first announced the work in September 2026 as it expands its operating fleet of rigs.

In a later statement, it reported that the contract, which is valued at around 100 million Omani Riyals (US$260mn), had been formally signed, adding to an existing work backlog.

“We are extremely pleased with this award, which is testimony of PDO’s trust in Abraj’s operational execution excellence,” said Eng. Saif Al Hamhami, the company’s CEO.

“This new contract also further strengthens our backlog position and our ability to secure future earnings.”

The workover units are expected to start between the third quarter of 2027 and the fourth quarter of 2028, he added.

One of Oman’s leading onshore drilling contractors, Abraj Energy currently boasts a modern fleet of almost 30 drilling rigs and five workover rigs, as well as hydraulic fracturing and cementing services.

It recently deployed its first new-built Wave III rigs, announcing full utilisation of its fleet in its latest earnings release, released in early November.

“Looking ahead, we remain very optimistic about the business environment, supported by strong tendering activity and a robust pipeline of growth opportunities across local and regional markets,” said Al Hamhami.