OFFSNET OFFSNET
  • Home
  • About
  • News
    • Asia Pacific
    • Australia
    • North America
    • Latin America
    • Middle East
    • Europe
    • West Africa
  • Reports
  • Careers
  • Team
  • Contact
  • Conferences
    • Upcoming Conferences
OFFSNET OFFSNET
  • Home
  • About
  • News
    • Asia Pacific
    • Australia
    • North America
    • Latin America
    • Middle East
    • Europe
    • West Africa
  • Reports
  • Careers
  • Team
  • Contact
  • Conferences
    • Upcoming Conferences

Sign up for our newsletter

Asia Pacific
Australia
North America
Latin America
Middle East
Europe
West Africa
{loadmoduleid 1581}

Middle East

Flapper Valve Milling Inspection

  • Region: Middle East
  • Topics: All Topics
  • Date: Jan, 2017

Flapper Valve Milling Inspection

This Video of the Month is from a well in the Middle East. The operator utilized EV’s Optis™ HD Memory camera to inspect the flow tube and flapper valve condition of a surface-controlled safety valve. Earlier intervention work had resulted in the need to fish tools at the valve but now the functionality of the valve was in question. There was communication across the valve but not access through it.

EV’s HD memory camera was deployed on slickline and here we find the actuated flow tube shifting up and down properly while the camera is stationary. The operator prepped the well by pumping clear water and shutting the well in to allow a gas phase to build at this shallow depth from the surface. On the same camera run but one meter deeper is the flapper valve which should open as the flow tube is cycled. However, the flapper is jammed in a partly open position allowing fluid to pass by but not equipment.

The operator decided to mill through the flapper with a hydraulic workover unit and requested EV’s HD memory camera to check milling progress if there were issues. The flapper valve was successful milled through but a subsequent gauge run stacked out 32m below the valve. The camera was deployed to inspect the milled area of the safety valve and the cause of the deeper obstruction. The video shows a very clean milling job in the flapper area with no potential hazards to hang up tools. 32m deeper we find part of the milled flapper has fallen and is now stuck across the well bore. The operator elected to install a temporary safety valve and return the well to production and will attempt to recover the fish at a later date.

  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11

Page 11 of 11

Linkedin
Twiter
Contact Us

Quick Links

  • Reports
  • Conferences
  • Contact
  • Terms & Conditions

Latest Update

  • Vantris Energy secures major offshore deal with Aramco
  • Helix Energy's Q3 2025: a financial comeback story
  • Beacon's Shenandoah sees boosted production post ramp-up
Address: University House, 11-13 Lower Grosvenor Place,
Westminster, London, SW1W 0EX
Phone: UK: + 44 (0) 20 3411 9937
Email: info@offsnet.com
Newsletter

Copyright © 2025 Offshore Network